Technology Products
|
Case Studies - Success StoriesBelow is a SQD Case Study that Springfield Electric was involved with:
This a project that was done at St. John’s Hospital in Springfield using Square D Powerlogic to improve the hospital’s process and system reliability. This project spanned several years and was implemented in stages, and is now one of the most advanced installations Powerlogic has done.
There is a white paper explaining the project, and also a video featuring one of the engineers we work with at St. John’s.
This is a solution that can easily be applied to all the hospitals we call on.
St. John's Hospital A few years ago when upgrading the electrical infrastructure, St. John’s called on Schneider Electric to implement a power monitoring system that would integrate the facility’s critical power components into one networked system and ensure stable, reliable power.One of the great features of the PowerLogic system is the integrated emergency power supply system (EPSS). The EPSS reporting function automates the required documentation that St. John’s needs to provide on a monthly basis to outside agencies such as the Joint Commission, he nation’s predominant standards-setting and accrediting body in health care.
St. John’s Hospital in Springfield, IL. is a 730-bed hospital with more than 1.7 million square feet of facility space, and functions as a regional referral medical center for cities throughout central and southern Illinois.
> St. John's Customer Video (approx. 5 minutes in length) |

A few years ago when upgrading the electrical infrastructure, St. John’s called on Schneider Electric to implement a power monitoring system that would integrate the facility’s critical power components into one networked system and ensure stable, reliable power.